\"\" \"\" \"\"
Go backward to Transfer of Control
Go up to Going Inside
Go forward to Multicasting
RISC-Linz logo

Operation Cycle

  1. Lecturer starts local system.
  2. Participants start local systems registering themselves at the lecturer's system.
  3. Multicasting of notebook.
  4. Iterations of:
    1. Controlled Operation.
    2. Optionally one of the following:
      • Independent operation (optional retrieval of result notebooks).
      • Temporary transfer of control (optional storing of result notebook).
    3. Multicasting of notebook.
  5. Termination of session.

What about latecomers?


Author: Wolfgang Schreiner
Last Modification: March 9, 1999

\"\" \"\" \"\"